Here’s another drop at Old Billingsgate. This one was more difficult to rig as there was no simple route for the pull line. The 4 banners under the net were held in place with 4 steel cables which were sharp to touch. I didn’t want the pull line going anywhere near these so I took … Continue reading Schneider Electric
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed